Internal rep guide · RTX PRO 6000 Max only · Page 1 of 2
Qualify. Quote. Explain.
Lead with the complete household picture: qualifying solar, one vendor-owned node and clearly separated financing and hosting agreements.
Current PROSPER offer: RTX PRO 6000 Max only. New solar or a qualifying second solar system; no standalone node or battery-only sale. Availability follows active program markets; do not claim all 50 states.
- Qualify the site. Verify property authority, active market, suitable solar scope, climate-controlled indoor location, structure, grounded 120 V / 60 Hz power and 1 Gbps upload/download with wired Ethernet. Flag placement and added work at survey.
- Build one proposal. Add $22,000 equipment and $500 installation labor once, for a $22,500 node package in the same solar proposal. Check quantity and duplicates. Verify cash total and financing / PPW / payment caps; do not hide or omit the node's cost.
- Confirm fulfillment. Orders follow completed solar installation and funding. Allow an estimated 1-2 weeks to the preferred installer warehouse. Node installation is additional work, estimated at about 2 hours between solar-install and inspection completion. Activation starts the base; before PTO is a target, not a deadline. Route lender documents through the actual finance team.
- Model costs once. The current PROSPER calculation uses 4,730 kWh/year at 90% utilization as an energy planning input. When already included in the solar savings calculation, do not subtract it again. Extra cooling and internet changes require their own costs; use the actual proposal and tariff.
- Review hosting terms. Show the supplier's original agreement, complete Max enrollment and installation records, and separate the supplier's obligations from PROSPER's role. A signed solar agreement does not by itself establish node activation.
Use this homeowner explanation
“The RTX PRO 6000 Max is a vendor-owned compute node we can include with a qualifying solar project. The node package adds $22,500 to the proposal. Under the separate hosting agreement, Vendor pays a $400 monthly fixed base during eligible hosting and may pay a network bonus up to $400. The bonus may be zero. We'll review your home, internet, total project cost and the full agreement together.”
Payments
$400 fixed base: Vendor's contractual obligation, payable even at zero compute utilization during eligible hosting.
$0-$400 variable bonus: allocated from the pool equal to 50% of positive network monthly surplus, capped under the agreement. $800 is the combined ceiling; it is not expected income.
Vendor initiates monthly payments by the 15th of the following month. Partial months are prorated. Bill credits reduce cash dollar for dollar.
Compensation
The current seller guide describes the closer's normal full solar commission and 50% of solar commission for referral-only work. Enter dollar amounts only after verifying the deal's commission rate and applicable terms.
Illustrative node compensation. $1,000 after installation and $100 per month while the node remains in qualifying active production. Illustrative rep compensation per qualifying node. Actual compensation is set by the applicable written compensation schedule and may change with production, utilization, program economics and eligibility. Monthly residuals continue only while the node remains in qualifying active production. Installation payment timing and conditions follow that schedule. Explore the example.
Historical income illustrations are not current rep pay or typical results.
Internal rep guide · Agreement review · Page 2 of 2
Make the limits clear.
| Homeowner question | Explain accurately |
|---|---|
| “Is the node free?” | No. The node package is $22,500 in the project. $0 down applies only to qualifying financing. A cash quote includes the complete project cost. Vendor retains equipment ownership. |
| “Does it cover my bills?” | The hosting payment is a defined contribution. Bills, financing, taxes, internet and electricity remain the homeowner's responsibility. Authorized bill payments count toward the same payout; they are not extra. |
| “Who guarantees the base?” | Vendor promises the fixed base under the separate hosting agreement. PROSPER does not guarantee Vendor's payment or financial performance. The variable bonus may be zero. |
| “What if I want to stop?” | No convenience cancellation is provided. Termination requires mutual written agreement or rights under law. Hosting changes do not cancel or amend the separate solar loan, lease or PPA. |
| “What if Vendor fails?” | Section 16.1 describes a credit of independently appraised current equipment FMV toward designated financing for permanent Vendor service failure, on the agreement's terms. It is not a guaranteed original-price refund, full payoff or reduced payment. Insolvency law applies; insurance is not established by the agreement alone. |
| “What if I move?” | Notify Vendor in advance. A buyer must consent to a written hosting assumption, with site and other required approvals. A sale, move or unsuccessful transfer alone does not trigger the FMV credit. |
| “How much power?” | Whole-node estimates: 80-130 W idle; 400-550 W workload. 700 W is a planning allowance, not a tested maximum. 1,000 W PSU capacity and 300 W GPU board power are different measures. Extra cooling is additional. |
| “Can I write it off?” | Payouts may be taxable. Obtain independent tax advice. Vendor owns the equipment; do not promise homeowner equipment depreciation, deductions or other tax outcomes. |
| “What does it compute?” | General-purpose GPU workloads managed by Vendor. Do not promise a named customer, AI demand level, medical use, research result or utilization. |
Before the homeowner signs
- Current market and new / second-system eligibility confirmed.
- Technical checklist completed; survey and vendor acceptance pending items disclosed.
- Node price added once; complete cash/finance proposal and lender caps verified.
- Actual electricity, internet, cooling, tax and financing assumptions discussed.
- Max plan and enrolled quantity match the supplier schedule.
- $400 base, variable bonus, payment timing and bill-credit treatment reviewed.
- 30-year term, vendor ownership, service access, termination, transfer and FMV limitations reviewed.
- Prepare the Prosper facilitation agreement, required state forms and applicable supplier hosting packet. Follow the SignNow preparation instructions.
Keep current proof. Use the current supplier hosting agreement and datasheet, plus the verified saved proposal. Clips and earlier playbooks are supporting context; they do not replace current signed terms. Use the applicable written compensation schedule for actual rep rates and payment conditions.