Check the home first.

Use this checklist with the homeowner and installer before promising eligibility or installation scope. Final approval requires the vendor's site review.

ItemSpecification or planning basis
Compute1 × NVIDIA RTX PRO 6000 Blackwell Max-Q Workstation Edition; 96 GB GDDR7 ECC; 300 W GPU board power.
CPU / memory / storageAMD Ryzen 9 9950X, 16 cores / 32 threads; 128 GB DDR5; 6 TB NVMe (2 TB system + 4 TB workload).
Cooling / softwareAir cooling throughout; no water cooling. Ubuntu Server and compatible NVIDIA drivers, managed by Vendor.
Approximate envelope800 W × 400 H × 220 D mm (31.5 × 15.7 × 8.7 in), excluding mounting rail, cable and service clearance.
Estimated weight34 lb (15.6 kg) node; 37 lb (16.6 kg) installed with rail. This is not a bracket capacity rating.

Location & installation

  • Dry, climate-controlled indoor location confirmed. A garage qualifies only if climate controlled.
  • Wall anchors reach suitable studs or framing. Drywall-only attachment is insufficient; bracket design must suit measured assembly weight.
  • Intake, exhaust, GPU cable bends and service access checked. Final clearances must be confirmed by the installer.
  • Grounded 120 V / 60 Hz outlet and sustained circuit capacity verified with other loads. Flexible mains cords remain outside walls.
  • Location and Ethernet route marked at survey. New wiring, sub-panel or extended runs are separately assessed scope.

Internet & activation

  • Service rated at least 1 Gbps download and 1 Gbps upload documented. A download-only gigabit plan is insufficient.
  • Wired Ethernet reaches the node; router, ports and cable route are suitable.
  • Vendor verifies service limits, compute-hosting permission and provider acceptance. Public-IP / port needs checked separately.
  • Any required ISP upgrade and extra monthly cost reviewed before commitment.
  • Host authority, reasonable service access and vendor acceptance recorded. Activation follows installation, commissioning and acceptance; it does not require a first paid workload.

Power: use the right number

ScenarioWhole-node outlet estimateEnergy if continuous
Idle / low activity80-130 W58-94 kWh / 30-day month
Workload400-550 W288-396 kWh / 30-day month
Planning allowance700 W sustained; not tested max504 kWh / 30-day month

300 W is GPU board power. 1,000 W is PSU capacity, not node draw. Size, weight and power are preliminary estimates pending final assembly validation. Air-cooled CPU limits and sustained temperatures need validation; additional household cooling electricity is extra.

Proposed location / Ethernet route
ISP download / upload; circuit review
Additional scope / unresolved items
Reviewer / review date / vendor acceptance