Internal seller playbook · 1 of 8
Solar + compute
A practical guide to explaining, qualifying and delivering a solar-attached compute node. This is original PROSPER material for representatives, built around the current Max offer.
The offer
A homeowner provides an approved indoor hosting location, electricity and wired internet for one vendor-owned RTX PRO 6000 Max node. The compute supplier manages its workloads and owes the hosting payments under a separate agreement. The node is offered with a new or qualifying second solar system, subject to market, site and lender approval.
PROSPER's role
PROSPER explains the offer, coordinates the solar quote and installation handoff, and helps the homeowner reach the appropriate project or supplier support route. PROSPER is not the manufacturer, equipment owner, compute operator, lender, insurer or guarantor of Vendor's payments.
Use the actual solar/installation contracts and supplier hosting agreement to identify each party's duties. Branding this guide does not transfer those obligations to PROSPER.
Vendor's role
Vendor retains equipment ownership and provides the required equipment upkeep, upgrades, service, repairs and replacements through the 30-year term from activation. Vendor administers compute activity, statements and hosting payments.
The host maintains required electrical and internet service, provides reasonable access, reports outages and avoids unauthorized changes or relocation.
Use the current terms
- Hosting Agreement Rev 2.10 controls current hosting terms. Technical Datasheet Rev 0.2 defines the preliminary Max-Q technical basis.
- PROSPER offers RTX PRO 6000 Max only. Do not present lower tiers, a standalone node, battery-only availability, or unverified all-state coverage.
- No convenience cancellation; no automatic financing cancellation; no promise that hosting covers all bills.
- Income, tax and equipment-resale assumptions must remain separate from the verified project price.
Navigate: hardware (2), power/site (3), quote/delivery/privacy (4), full FAQ (5-6), talk tracks and pay (7), final review and sources (8).
Technical reference · 2 of 8
The hardware
This is the single-GPU Max-Q configuration. Component specifications are manufacturer-rated; final assembly measurements and sustained performance remain subject to validation.
| Component | Current specification |
|---|---|
| GPU | 1 × NVIDIA RTX PRO 6000 Blackwell Max-Q Workstation Edition; 96 GB GDDR7 ECC; active cooling; 300 W board power. |
| Processor | AMD Ryzen 9 9950X; 16 cores / 32 threads; AM5; 170 W default TDP. CPU TDP is not whole-node outlet draw. |
| Motherboard | ASUS ProArt X870E-Creator WiFi; ATX; PCIe 5.0 x16 graphics; onboard 10GbE and 2.5GbE Ethernet. |
| System memory | 128 GB DDR5 UDIMM, matched 2 × 64 GB kit. Exact kit must match the board compatibility list, using validated JEDEC settings. |
| Storage | Samsung 990 PRO 2 TB system/container SSD + 4 TB workload SSD; 6 TB total, PCIe 4.0 NVMe M.2, without separate heatsinks. |
| Power supply | Corsair RM1000x ATX 3.1; 1,000 W output capacity. This is capacity, not expected node consumption. |
| CPU cooler | Noctua NH-U12A air cooler; 158 mm cooler height, including its two CPU fans. Full enclosure stack-up needs validation. |
| Enclosure fans | 4 × ARCTIC P14 PWM PST 140 mm fans; separate from the CPU-cooler fans. |
| Operating system | Ubuntu Server with compatible NVIDIA drivers and container runtime, managed by Vendor. |
| Cooling basis | Air cooled throughout; no water cooling. AMD recommends liquid cooling for optimal stock 9950X performance; air-cooled CPU power limits and sustained temperatures require validation. |
Enclosure
| Measurement | Preliminary basis |
|---|---|
| Design envelope | 800 W × 400 H × 220 D mm; approximately 31.5 × 15.7 × 8.7 in. Excludes wall rail and cable/service clearance. |
| Construction | 2.0 mm 5052 aluminum sheet, dark finish, removable front cover. Illustration alone does not establish mounting points or connector locations. |
| Node assembly | Approximately 15.6 kg / 34 lb calculated. Allow 14-18 kg until final parts and enclosure are weighed. |
| Installed assembly | About 16.6 kg / 37 lb including a separate 1.0 kg wall-rail allowance. This is not a bracket load rating. |
Do not imply a custom PROSPER appliance. These are the supplier's current specifications, presented by PROSPER. Later approved successor hardware does not by itself reset the hosting term or change the enrolled base and bonus cap.
Technical reference · 3 of 8
Power & placement
Quote outlet power as an estimate, and approve the location against real structure, sustained circuit load, Ethernet and cooling.
| Scenario | Whole-node outlet estimate | If sustained 30 days |
|---|---|---|
| Idle / low activity | 80-130 W | 58-94 kWh |
| AI workload | 400-550 W | 288-396 kWh |
| Planning allowance | 700 W sustained; not a tested maximum | 504 kWh |
Power basis: the datasheet allowance uses 300 W GPU + 230 W CPU package allowance + 70 W other components = 600 W DC. At assumed 90% PSU efficiency this is about 667 W AC, rounded to 700 W. At 120 V and 0.95 power factor, estimated current is about 3.5-4.8 A at workload or 6.2 A at the allowance. The 300 W GPU rating and 1,000 W PSU capacity are not whole-node operating draw.
Site checklist
- Dry, climate-controlled indoor location with open intake/exhaust airflow and service access.
- Mounting anchored into suitable solid structure. Drywall-only attachment is insufficient; verify bracket engineering against measured weight.
- Grounded 120 V / 60 Hz outlet, rated cord and sustained circuit suitability with other appliances.
- Flexible mains cords remain exposed; do not conceal them inside walls. Verify approved GPU power cable seating and cable bends.
- Wired Ethernet to the node; service rated at least 1 Gbps download and 1 Gbps upload.
- Vendor verifies ISP hosting permission, service limits, router/network suitability, compute-provider acceptance and separate public-IP / port needs.
Engineering estimates
The assembly mass budget uses: cabinet 7.0 kg; GPU 1.23 kg; board 1.579 kg; CPU 0.04 kg and RAM 0.08 kg allowances; SSD pair up to 0.018 kg; cooler 1.220 kg; PSU 3.12 kg; case fans 0.776 kg; riser/wiring 0.55 kg.
The cabinet estimate is 1.168 m² closed-box area × 2 mm × 2,680 kg/m³ = 6.26 kg, less 0.40 kg cutouts plus 1.14 kg flanges/tray/finish/hardware = 7.00 kg. Allowances are not CAD-derived. Board mass is a secondary-source figure; PSU cable/accessory scope is unverified. Packaging is excluded.
Finalize real measurements, clearances, air-cooled CPU limits and sustained temperatures before installation acceptance.
Model electricity once. PROSPER's current calculation uses 4,730 kWh/year at 90% utilization as a planning input, not a metered hardware rating or an earnings forecast. When already included in solar savings, do not subtract it again. Extra household cooling and any internet upgrade cost are additional. Actual tariff, solar production and household use determine the result.
Operating sequence · 4 of 8
One quote
Use one solar quote and a traceable handoff. A draft, uploaded check image or estimated delivery date is not approval, cleared money or activation.
- Qualify. Confirm active market, residential/property authority, new or qualifying second solar scope, location, power, wired symmetric internet, added work and lender caps.
- Quote once. Start the central solar + node quote. Add $22,000 equipment and $500 labor once. Verify the full cash total and the actual approved finance structure. Continue the same record through saved intake; do not create a second node deal.
- Use the native contract packet. Hosting Rev 2.10 is automatically included in the native Powur packet. Verify the correct Max plan and node quantity in the actual schedule. Do not manually send a separate hosting contract or alter supplier terms. Lender documents go through the actual finance team and authorized workflow.
- Order after the required milestones. Node ordering follows both completed solar installation and funding. Record those confirmed milestones. A submitted packet or uploaded payment item is not proof of funding.
- Coordinate delivery and additional work. Estimated lead time is 1-2 weeks, preferably to the installer warehouse. Node installation is additional work, estimated at about 2 hours, planned between solar-install and inspection completion. These are planning estimates, subject to actual coordination.
- Activate and verify. Installation, commissioning and Vendor acceptance establish activation. Activation starts the fixed base. Activation before PTO is a target, not a guaranteed deadline; payment timing follows the hosting agreement.
Cash and finance
A cash proposal must show the complete project cost, including the node package. $0 down is conditional on qualifying financing. Price-per-watt, payment and other lender caps can prevent a project from qualifying.
PROSPER facilitates the quote and handoff. Do not claim lender acceptance, place an order or describe a project as funded without the proper party's verified result.
Secure handoff
If approved instructions require a deposit or check, direct it through the designated secure provider process. Record only the necessary handoff status and reference.
Received, forwarded, accepted, deposited, cleared and funded are different states. A photo, upload or handoff is not proof a bank deposited or cleared funds. Use actual provider confirmation for those claims.
Keep sensitive material in the approved secure channel. Do not place banking credentials, account/routing numbers, check images, Social Security numbers, tax documents or payment details into public pages, ordinary notes, emails, chat transcripts or general resource files. The homeowner enters vendor banking information only through the vendor's authorized secure onboarding route. This guide does not establish a deposit-taking or bank-processing service.
Full homeowner FAQ · Part one · 5 of 8
Money & agreement
Is the payment guaranteed - what if the node earns little?
Vendor contractually guarantees the $400 Max fixed monthly base during eligible hosting, even if the node earns nothing and regardless of compute utilization, demand, pricing or collections. Vendor bears that shortfall risk. The additional network bonus can be zero. This is a defined contribution toward costs, not a promise to cover every bill or hold electricity costs to a baseline. PROSPER does not guarantee Vendor's payment or financial performance.
Who owns the node, and what does the homeowner pay?
Vendor, Inc. retains equipment title during the 30-year service term and is responsible for necessary upgrades, maintenance, service, repairs and replacements at no equipment-service cost to the host. The homeowner's project still includes the $22,500 node package. The cost is part of the solar purchase or qualifying finance structure; the node is not free. $0 down depends on qualifying financing, while a cash quote includes the full cost.
How and when does the homeowner get paid?
The base and any earned bonus are initiated monthly on or before the 15th of the following month, with an itemized statement; partial months are prorated by eligible days. Activation is installation, commissioning and Vendor acceptance, not the first paid workload. Do not promise an exact first-deposit date or “30 days after install.” Payment/banking setup belongs in the vendor's authorized secure process. Authorized bill payments reduce the same-period cash balance dollar for dollar.
Can the homeowner cancel?
The agreement has a 30-year service term from activation and provides no convenience cancellation. Ending hosting requires mutual written agreement or rights under applicable law; mandatory statutory cancellation rights remain. Paid fixed bases are not recoverable from personal funds; authorized same-period advances and bill payments are credited only once. Earned, unpaid base payments and bonuses remain due under the agreement. Ending hosting does not cancel or change the separate solar loan, lease or PPA.
What happens to the financed node cost if hosting ends or it is removed?
Financing continues under its own terms. Elective discontinuation does not create a credit. Under §16.1, permanent Vendor cessation or permanent failure of agreed hosting services can trigger an independently appraised current-equipment FMV financing credit, paid under the agreement's process within 90 calendar days after the appraisal is finalized. It is not the original purchase price, a guaranteed payoff, reduced payment or funded insurance. Temporary outages, repairs and swaps do not trigger it. Insolvency law and court orders can affect enforcement.
What happens if the homeowner sells or moves?
Notify Vendor before a sale, move or occupancy change. The node is intended to remain with the home and associated improvement. Vendor coordinates a written assumption of the remaining term with the successor's consent, site suitability and required approvals. A completed assumption releases the departing host from future hosting obligations. Authorized relocation may be possible if the financed improvement itself moves. A sale, move or unsuccessful transfer alone does not trigger FMV protection or amend financing.
Temporary outages: the current agreement protects the base during temporary power/internet outages and Vendor-directed maintenance, repair, replacement or safety disconnection, subject to its hosting/cooperation terms. Do not equate a temporary outage with permanent service failure or FMV eligibility.
Full homeowner FAQ · Part two · 6 of 8
Home & support
What exactly is the AI node?
The PROSPER offer is one RTX PRO 6000 Max: a wall-mounted, air-cooled computer with one NVIDIA RTX PRO 6000 Blackwell Max-Q GPU, 96 GB GDDR7 ECC, Ryzen 9 9950X, 128 GB DDR5 and 6 TB NVMe. Vendor manages general-purpose GPU workloads through its network. The standard quote covers one node; additional nodes are not included or promised.
What can it be sold with? Can an existing-solar home qualify?
It is attached to a new qualifying solar system, with or without batteries, under an approved cash, loan, lease or PPA structure. A home with existing solar from any installer needs a qualifying second solar system. It is not offered standalone or on a battery-only project. Availability depends on the active program market, site acceptance and lender limits; do not claim all-state availability. Design added production against actual load and production rather than promising panels erase all node power costs.
What does it cost, and what does “$0 down” mean?
The package is $22,000 equipment plus $500 installation labor: $22,500 total, added once to the same solar proposal. The complete cash quote includes the cost. $0 down describes an available qualifying finance structure, not a free node or approval promise. Pricing, payment, PPW and lender limits must be checked on the actual proposal. Never add the package twice or omit its cost from the customer's total.
Where does it go, and what does the home need?
Choose a dry, climate-controlled indoor location with structural mounting, open airflow and service access, usually near the router or smart panel. A garage or utility room qualifies only if climate controlled. A single node requires grounded 120 V / 60 Hz power on a suitable circuit and wired Ethernet with service rated at least 1 Gbps upload and download. Vendor verifies site, ISP permissions and network suitability. New wiring, a sub-panel or an extended Ethernet run is extra assessed scope.
Is the income guaranteed?
Only Vendor's $400 fixed base is contractually guaranteed during eligible hosting. The Max bonus is variable, can be zero and is capped at $400; $800 is the combined maximum, not a forecast. Net household benefit also depends on financing, electricity, possible extra cooling, internet and taxes. Never describe the cap as a promised payout or promise the payment covers every bill.
Who handles support and repairs?
Vendor owns, manages, services, repairs, upgrades and replaces the equipment under the hosting agreement. Its app is described as a place to view computing activity and earnings; confirm current app and secure payment instructions at onboarding. Use the current supplier notice/support details in the actual agreement for supplier service. PROSPER: support@prosper.energy · 877-317-9079 for project coordination. PROSPER does not replace Vendor's service or payment obligations.
Will it do medical or scientific research?
That workload is not assured. Vendor operates a general-purpose compute network; no named customer, medical project, research result, cure, specific AI task or utilization level is established for an individual node. Explain only the general compute-hosting function and the supplier's actual contractual duties.
Is hosting income taxable?
Payouts may be taxable; some properly attributable expenses may be deductible depending on the host's situation. Obtain independent tax advice. Vendor owns the node, so do not promise the homeowner equipment bonus depreciation, a deduction, a tax refund or any specific tax treatment.
How long does the seller residual last?
Prosper’s illustrative rep model is $1,000 after installation and $100 monthly for the duration of qualifying active node production. Actual amounts, eligibility and payment conditions follow the written compensation schedule and may change with production, utilization and program economics. Explore the current example.
Seller conversations · 7 of 8
Explain it clearly
The opener
“Would you like to see whether a solar project with a vendor-owned compute node fits your home and budget? The Max hosting agreement provides a $400 monthly fixed base, with an optional network bonus. We can review the cost and full terms together.”
Thirty seconds
“We can include one RTX PRO 6000 Max node with a qualifying solar project. The package adds $22,500 to the quote. Vendor owns and manages the node and promises a $400 monthly base during eligible hosting under its separate agreement. A network bonus may add up to $400, but can be zero. We'll check your home, internet, total project cost and agreement before you decide.”
Rep compensation
The current seller guide describes the closer's normal full solar commission and 50% of solar commission for referral-only work. A dollar amount requires the verified deal rate and applicable compensation terms.
Prosper’s illustrative rep model is $1,000 after installation and $100 monthly for the duration of qualifying active node production. Actual amounts, eligibility and payment conditions follow the written compensation schedule and may change with production, utilization and program economics. Explore the current example.
A referral-only rep should collect only authorized contact/qualification details and route the same record to the assigned closer. Compensation does not authorize an unsolicited customer send.
Objections
| Question | Clear response |
|---|---|
| “What if AI demand drops?” | Vendor's contractual base does not depend on compute demand or utilization during eligible hosting. The bonus can be zero. PROSPER does not guarantee Vendor's performance. |
| “Sounds too good to be true.” | Review the $22,500 package cost, $400 base, optional bonus, host expenses, 30-year agreement and financing separately. Use the actual documents, not a best-case income projection. |
| “I do not want a server at home.” | It is an air-cooled wall unit requiring indoor climate control, suitable structure, ventilation and service access. Review its approximate size, heat and actual proposed location before committing. |
| “Will my electric bill rise?” | The node consumes electricity. Use actual project production and cost assumptions; PROSPER's 4,730 kWh model input is already counted once when used. Extra cooling and internet may add cost. |
| “What if I want out?” | There is no convenience cancellation. Review mutual-agreement and legal rights, separate financing, transfer options and the limited FMV service-failure provision before signing. |
| “I am not a closer.” | Referral-only work is possible under verified terms. The seller guide describes 50% of solar commission; actual dollars require the deal's confirmed commission rate. No residual amount is confirmed. |
Six rules for every conversation
- Attribute the fixed-base promise to Vendor; distinguish it from a variable bonus.
- Explain a contribution toward costs; never promise every bill is covered.
- Describe only general compute use; do not promise a customer, research result or utilization.
- Show the node's cost; reserve $0 down for qualifying financing.
- Refer tax questions to an independent advisor; do not promise equipment depreciation.
- Use verified pay terms; no current residual amount or typical-income claim.
Final review · 8 of 8
Verify the handoff
Complete this review using the saved proposal, current native packet and supplier acceptance. This checklist is a review aid, not an approval or contract.
Project
- Active market and property authority verified.
- New or qualifying second solar system; one RTX PRO 6000 Max node.
- Survey location, structure, airflow, service access, power and 1 Gbps symmetric wired Ethernet verified.
- Extra wiring, ISP upgrade, cooling and other site costs assessed.
- $22,000 equipment + $500 labor added once; full cash total or qualifying finance terms reviewed.
- Actual lender caps and document workflow verified with the finance team.
Understanding
- Vendor's $400 base and $0-$400 bonus distinguished; $800 ceiling is not a forecast.
- Bill payments count dollar for dollar; electricity, taxes and other household costs remain relevant.
- 30-year term, ownership, service access, no convenience cancellation, transfer and FMV limitations reviewed.
- Hosting and financing are separate; PROSPER does not guarantee supplier payments.
- Native Max hosting schedule, quantity and actual signatures verified.
- Order milestones, secure handoff status, installation and activation tracked separately.
Source order
| Source | Use it for |
|---|---|
| Hosting Agreement Rev 2.10 · 2 Nov 2026 | Base/bonus rules (§§1,2,2.2), 30-year service and ownership (§§3-9), bill payments/timing (§§10-11), transfer (§12), tax (§14), eligibility/protection (§15), termination and FMV (§16-16.1). |
| Technical Datasheet Rev 0.2 · 10 Nov 2026 | Max-Q components, preliminary dimensions/mass, estimated outlet power and installation requirements. |
| Current seller guide · captured 13 Nov 2026 | Solar-attached quote structure, node price and current selling process. Current PROSPER scope narrows this pack to Max only. |
| Current owner-directed scope · 13 Nov 2026 | Max-only offer; 4,730 kWh/year model input; confirmed fulfillment sequence; shared quote/intake and secure-handoff boundaries. |
| User-supplied FAQ and historical sales materials | Question coverage and presentation context. Earlier payment models, cancellation claims and sales-income examples are superseded by current terms; none are current pay or forecasts. |
Open items are explicit. The current separate seller referral agreement and residual rate, final measured hardware/clearances, each site's ISP/lender acceptance and any effective third-party insurance/continuity documents still require specific verification. Do not fill those gaps with a promise.
Resource hub · Homeowner one-pager · Technical checklist · Revision and fact register